DP2 tekniske tegninger

Utvalgte tekniske tegninger av plattformen DP2. Klikk på lenkene under beskrivelse. - Selected technical drawings of the platform DP2, opens in Adobe Reader.
Du må ha Adobe Reader installert på din maskin for å kunne se tegningene.

Beskrivelse    Årstall
Vestsiden - West side view with new liebherr crane 1985
Boredekket - General arrangement drilling deck 1977
Plattformdekk - General arrangement support frame & tank level 1981
Plantegning - modul 2 - Plot plan module 2 1981
Plantegning - modul 1 - Plot plan module 1 1981
Boredekk og helikopterdekk - Equipment and Platform Layout, Drilling deck and Helideck 1982
Helikopterlandingsområdet - Helicopter landing area. view from above 1983
Boredekk - DP2 equipment & platform layout intermediate drilling deck 1985
Pumpehus og lagertanker - Plot plan pump house & storage tanks 1985
Utstyr nedre boredekk - Equipment & platform layout lower drilling deck 1986
Nordsiden - Remounting drawing elevation from north side emergency ladder 1986
Redningsutstyr vestside - Remounting drawing elevation from west side emergency ladder 1986
Boreslam- modul - Plot plan forex neptun mud cement module 1987
Plantegning modul 3 - Plot plan module 3 ( SHT 2-2 )  1990
Kjellerdekk - Cellar deck general arrangement 1992
Plantegning modul 3  - Plot plan module 3 (SHT-1-2) 1992
Østsiden - From east side emergency ladders 1986
DP2_&_Chris_Chenery_-_elevation_&_plan_VI 1978
DP2 unit__a__drilling_deck_framing 1974
DP2_modules_1_2_3_4 1980
Compressed_air_system_in_module_2_&_cement 1982
Compressed_air_system_in_generator_room 1982
Compressed_air_system_on_rig 1982
Axonometric_of_industrial_water_system 1982
Guiding_system_for_cable_carrier_trolleys 1983
Rig_plan_derrick 1985
From_east_side_emergency_ladders 1986
DP2 identification_plates_location_layout
Plot_plan_-_pump_house_&_storage_tanks
Plot_plan_-_module_1
Safety_plan_production_deck
Potable_water_system
P&ID_-_flare_system_
P&ID_-_mud_system_
DP2_module_1_piping_plan
Piping_general_arrangement_forex_neptun
Piping_general_arrangement_forex_neptun
DP2_drilling_derrick_profile_layout_north_
DP2_drilling_derrick_profile_layout_south_
Unit__a__truss_1
Unit__a__cellar_deck_framing
-
Plattformunderstellet - Jacket
Elevation a eln-2144-002
Elevation b eln-2144-003
Perspective eln-2144-001
Horizontalfrmg plan at el 100 000 328 1 eln-2144-109 1975
Internal joint stiffening at el 70 865 232-6 eln-2144-120 1975
Internal joint stiffening at el (-) 50 290 165 eln-2144-119 1975
JKT vert frm. at col lines 2 eln-2144-103 1975
Horizontal framing plan at el 11430 37-6 eln-2144-105 1979
Jacket vertical framing at col line 3  eln-2144-148 1979
Jacket vertical framing at col line a and b eln-2144-101 1979
Horiz frmg plan at el. - 28 955 95 0 eln-2144-106 1984
Horizontal frmg. plan at el 6 095 20+-0 eln-2144-104 1984
Jk. vert frmg at col line 4 eln-2144-149
-
Loading plans
Lower drilling deck allowable liveload 1984
Upper drilling deck allowable liveload 1984
Upper drilling deck allowable liveload production deck 1984
Cellar deck loading diagram eln-2144-004
Drilling deck loading diagram eln-2144-005
-
Topsides - Area and Access Plans
Access and platform general arrangement - sheet 2 of 2  1985
Access & platforms general arrangement 1985
Area key plan 1985
Crane coverage dp2 2003